A new ferry quay shall be constructed on behalf of Møre og Romsdal County on county road 61, Sulesund ferry quay. The work includes blasting for the establishment of new queueing places and car parks. The blasted matter shall be used as filling the sea for part of the new land area. The new land area shall be developed with asphalt, kerbstones, covering and planting. The old boat houses shall be demolished and a new area for boat houses and boat places shall be established by the breakwater. The new quay shall be constructed for 120 PBE, with an additional quay of 8 x 120 m with a ferry quay bridge of 12 x 18 m. The quay shall be suitable for electrical ferries. In addition avalanche mounds shall be constructed up to the houses by Nøringsetvegen, the mound shall be constructed by on-site matter with a brick back wall. The work will be carried out close to high voltage lines and close cooperation with the line owner, Mørenett, is a prerequisite.
New water supply to houses and the quay installations must be established before the avalanche mound is constructed. (Ground water well.) The ferries at the existing ferry quay shall be able to run as normal during the site period.