Engineering design for Frydenlund Primary School

Information

02 - Contract notice
Open procedure
2/7/2023 9:40 AM (GMT+01:00)
3/9/2023 11:59 PM

Buyer

Narvik kommune Narvik kommune
Kjetil Sønvisen
Postboks 64
8501 Narvik
Norway
959469059

Closing date has passed.

Short description

Narvik municipality will build a new 2-parallel primary school at Narkvikhalvøyen. It has been decided that the new primary school will be built on the current school site of Frydenlund primary school. The existing school will remain in operation during the construction. The contract includes assessing the construction of the school as an energy-plus-house, complete development of a preliminary project and turnkey contract description with all necessary drawings, requirement specifications and contest rules that form the basis for a tender contest for construction of the new primary school with accompanying outdoor areas. A cost analysis will also be prepared, giving a realistic and quality circle picture of the total cost of the project including LCC (Life Cycle Costs) and LCA (Life Cycle Assessment) is a systematic survey and assessment of environmental and resource impacts throughout the entire life cycle of a product. See the tender documentation for a further description of the procurement.

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00