Short description
This informative notice concerns contract B5 and comprises preparatory work for the building work for the new process building.
The contract includes the following main work:
• Establishment of the rigging area with a site road around the construction site.
• Establishment of support filling to the south of the site area in order to maintain area stability.
• Excavation of a construction pit for the process building. The footprint makes up approx. 3500 m2.
• Piling for the bottom plate for the process building and foundations for the new gas installations, 150-200 piles.
• Crossing the railway with emission pipelines from the treatment plant, including sheet piling hollows and pipe pressing.
• Establishment of new intake and emission pipelines inside the site for the treatment plant.