Assignment text
In this preparatory contract, approx. 350 m substructure for the line for a new double track is to be replaced. Temporary construction access shall be established to the mass handling plant at Nesten-Skjerden, including the construction of a construction culvert for the current Dovre line. It will also be necessary to managed acid-forming rock and radioactive masses, including any measures for handling contaminated construction water. The work must be executed before, during and after the quarry.