Assignment text
The scope of supply includes the complete functional supply of several cable systems for 400 kV. The amount of 400 kV AC underground cables is estimated to 400 kilometers single-core cables. The Contracting Authority expects to tender for a contract divided in 4 lots concerning AC underground cables 400 kV in May 2020. 3 lots will concern the Jutland west coast (328 kilometers single-core cables in total) and 1 lot will concern north Zealand (72 kilometers single-core cables). The scope of supply consists of all labour, equipment and materials required for design, fabrication, factory testing, supply, transport, construction, installation (joints, AIS terminations), completion, site testing, commissioning and taking-over testing of the entire supply and its systems and functions and supervision of cabling (civil works will be done by third party). In addition, the supply includes all drawings, operating instructions and manuals, general and detailed drawings and design calculations.