Title |
Closing date |
SMLS Pipe ASTM A335 Gr.P5 and P9+NT+hardness test; ASME B36.10 and
|
10/18/2019 9:00 AM
|
Fittings (Elbow, Reducer, Tee) ASTM A234 WP9 according attached specification, 7 items
|
9/17/2019 9:00 AM
|
Greito jungimo perėjimai NPT / Reducing nipple NPT from 1/2"; 3/4"; 1" to 1 1/4" 1 1/4"
|
8/20/2019 1:00 PM
|
GATE VALVE DIN 3352, Dn50-150, steel ASTM A216 WCB, Solid wedge without Backseat bushing
|
8/28/2019 1:00 PM
|
PIPES 1", 2", 6", 8" SMLS ASTM A335 Gr.P5+NT+hardness test; ASME B36.10, PED2014/68/EU, Cert.3.1:
|
8/22/2019 11:30 AM
|
Small size 1/2" - 2" valves from SS and spec steel
|
8/22/2019 9:00 AM
|
GATE VALVE 1" -2", API600, ASME B16.5,ASME B16.10, A216WCB, Solid wedge, Without backseat bushi
|
8/21/2019 1:00 PM
|
Engine guards relay General Electric Multilin 239-RTD-AN
|
7/12/2019 12:00 PM
|
SMLS pipe 426x16mm, steel 20, GOST 8732 or TU
|
7/17/2019 2:00 PM
|
Vamzdis cinkuotas Dn100x4,5 (D iš.108mm) P235TR1 ar pan. Tiekimui iki 2019-12-15
|
6/11/2019 1:00 PM
|
Elbow, Pipes and other for the Heater KR-202
|
6/3/2019 2:00 PM
|
Plokštelės siurblių centravimui, anglinio plieno ir "TMAS-SKF" nerūd. plieno, pagal specifikacijas
|
5/16/2019 1:00 PM
|
Twisted / wrapped / etc. tubes bundles to change existing tube bundles of Heat exchanger's TK-302 and TK-303 of the LK-1, LK-2
|
5/27/2019 1:00 PM
|
Pipes SMLS 1" and 2" Sch.80S, form SS steel ASTM A790 S32205. For the delivery till 10-05-2019
|
4/11/2019 9:00 AM
|
Electrodes and welding wire (TML, FOX, CL, UTP)
|
3/27/2019 1:00 PM
|
Twisted tube bundles to change existing exchanger's tube bundles TK-302 and TK-303 of the LK-1, LK-2
|
3/8/2019 7:00 AM
|
Suport under T-joint
|
2/20/2019 10:00 AM
|
LISEGA Support acc. attached specification, for the project ATN-19-6/2-000
|
2/7/2019 9:00 AM
|
Tube bundle of heat exchanger TK-1/2, TK-1/3, TK-2/1, TK-2/2, TK-/3, in two steel option
|
1/31/2019 2:00 PM
|
Tube bundle of heat exchanger TK-106/2, LK-2, (L=9000mm, Ds1200, Ps25) Requisition OL18-14
|
1/31/2019 2:00 PM
|
Tube bundle of heat exchanger TK-106, VGO HDT, GP-2, S-100. (L=4500mm, Ds1000). In two option
|
2/1/2019 9:00 AM
|
Twisted tube bundles to change existing exchanger's tube bundles TK-302 and TK-303 of the LK-1, LK-2
|
2/5/2019 10:00 AM
|
Tube bundle of heat exchanger TK-1/2, TK-1/3, TK-2/1, TK-2/2, TK-/3, in two steel option
|
1/22/2019 1:00 PM
|
Tube bundle of heat exchanger TK-106, VGO HDT, GP-2, S-100. (L=4500mm, Ds1000). In two option
|
1/17/2019 1:00 PM
|
Perėjimas koncentrinis 377x10 - 355,6x9,5 SMLS BW, plienas 20 / P265GH bei Atramos ir Aklė
|
12/14/2018 8:00 AM
|
Fittings (Elbow, Reducer, Tee) ASTM A234 WP5 and WP9 according attached specification, 12 items
|
11/15/2018 2:00 PM
|
Stainless steel and Gr.F5 Flanges, Elbows and other fittings
|
11/15/2018 1:00 PM
|
Steel 08X18H10T or analogue fittings acc. GOST, ATK, TU, TM standarts
|
11/13/2018 9:00 AM
|
PIPE SMLS ASTM A335 Gr.P5; P9; P91 and EN X11CrMo9-1, Accoording attached specification
|
11/9/2018 12:00 PM
|
SMLS Pipes SS 08Cr18Ni10Ti (ASTM A312 Gr.TP321) or EN standarts
|
11/7/2018 1:00 PM
|
Tube bundle and distribution chamber of heat exchanger IK-201, LK-1
|
10/11/2018 2:00 PM
|
Heat exchanger 10TK-1B in two option: AEU type with U-tube bundle 2-bled shell or “Compabloc” type
|
9/14/2018 4:00 PM
|
Pipe O.D.140 x W.T.25mm SMLS steel 10X23H18 GOST 5632 or alternatyve
|
8/31/2018 9:00 AM
|
7 m³ konteineris skardos (metalo laužo) surinkimui
|
8/24/2018 9:00 AM
|
Pump dispenser ,,MILTON ROY MD140H4M9.6/C2.VV3.Z.“, without the electric motor
|
8/20/2018 2:00 PM
|
Heat exchanger 10AV-2 in two option: AEU type with U-tube bundle or plate “Compabloc” type
|
8/30/2018 2:00 PM
|
Heat exchanger AV-6 in two option: AEU type with U-tube bundle or plate “Compabloc” type
|
8/30/2018 2:00 PM
|
Lakštas 4x1500x6000 pl.3 Sp/Ps, 2-5kat. GOST 380-71, // S235JR /+N/+M arba kt pagal EN
|
8/14/2018 7:00 AM
|
Lakštai 2 ir 3mm pl.3 Sp/Ps, 2-5kat. GOST 380-71, GOST 19903-74 // S235JR /+N/+M pagal EN10025-2/EN
|
7/30/2018 2:00 PM
|
Manual Sample Stations according attached Technical Specification
|
8/16/2018 9:00 AM
|
Lakštai 2 ir 3mm pl.3 Sp/Ps, 2-5kat. GOST 380-71, GOST 19903-74 // S235JR /+N/+M pagal EN10025-2/EN
|
7/30/2018 10:00 AM
|
Alkūnė/ ELBOW acc OCT 24.321.04 90*-377x45-500x2000x4855, R=1500, plienas/ steel 15X1M1Ф pgl TУ 14-3-460 2009
|
8/3/2018 9:00 AM
|
Vožtuvas gariniam stūmokliniam siurbliui PDV 25/20 B
|
7/18/2018 9:00 AM
|
Rotoriai siurbliui BORGER PL300
|
7/17/2018 2:00 PM
|
Gate valves 1/2" - 1“ from steel A105N, F5 ir F347 - for the Long term contract
|
7/4/2018 1:00 PM
|
Gate valves 1/2" - 1“ from steel A105N, F5 ir F347 - for the Long term contract.
|
7/3/2018 2:00 PM
|
Rutuliai špižiniai apvalūs D5+/-10%mm
|
6/7/2018 3:00 PM
|
Plate-type (compabloc) heat exchanger „SWEP“ M10Nx60/1P-CSN-S 4x1
|
5/31/2018 2:00 PM
|
Pipes D159x10-12mm SMLS, X11CrMo5+NT (1.7362+NT), hardness test, EN 102016-2
|
5/29/2018 8:00 AM
|
Spiral Heat exchanger TK-2/4
|
5/30/2018 1:00 PM
|
Heat exchanger TK-2A/B in two option: U-tube bundle or “Compabloc” type
|
5/25/2018 9:00 AM
|
Special Bidirectional Ball valves, 3" - 14", steel F5 and C12, According the attachment Requirement
|
5/17/2018 1:00 PM
|
Pipes D159x10-12mm SMLS, X11CrMo5+NT (1.7362+NT), hardness test, EN 102016-2
|
5/9/2018 9:00 AM
|
Elbow, Pipe D368x and Nipple from steel 10CrMo9-10+NT
|
5/8/2018 2:00 PM
|
Stud Bolt with Nuts, Nuts and Threaded bar - for the Long term contract.
|
5/5/2018 9:00 AM
|
GOST fasonyna, pagal specifikaciją / GOST fittings
|
4/25/2018 1:00 PM
|
Electrodes and welding wire - FOX and UTP
|
3/23/2018 8:30 AM
|
Sampling system of petroleum products, including valves, possibly coolers, containers, etc.
|
1/11/2018 12:00 PM
|
Vamzdis Dn100, D išorinis 108mm, S-4,5mm cinkuotas
|
12/7/2017 11:00 AM
|
Stud Bolt with Nuts, Nuts and Threaded bar - for the Long term contract.
|
12/14/2017 10:59 PM
|
Dangčiai oriniams aušintuvams AO-1A,B,C,D/Air cooler AO-1A,B,C,D removable bonnet headers(VP-299014)
|
11/15/2017 8:00 AM
|