The project includes construction of a new road with bicycle lanes and sidewalks from the roundabout at the CC and the junction with St Olavsgt, total length approx.600 meter.Projects are divided into the following parcels:
— Parcel 1: Roundabout at the CC. New roundabout at the intersection of Anne Disens veg
— Parcel 2: New roundabout at the intersection of Anne Disens road - including intersection with St. Olavs gate
The new road will be built with 6.5- metre roadway lanes, 1.5-metre bicycle lane along the direction direction into and out of Hamar.A 2-metre green-field zone shall be established on each side of the new road.This is in addition to the 3-metre sidewalks on each side, and then 1.5 metres to nearby walls.
The road is planned to use a whole new profile and be built as a city street.
Informative quantities:
Soil Masses for depot approx. 13 000 m3
Marsh and other unusable masses approx. 1 400m3
Delivery of contaminated soil approx. 40 tons
Pipe trenches in soil 330m.
Levelling.Adjustment and compaction of road bed on the ground approx. 13 000m2
Reinforcement layer of crushed stone applied from outside ca. 6 800m3
Base course of crushed stone (FK) approx. 2 600m3
Base course asphalt shingle Ag 4 000m2
Demolition asphalt covering 10 500m2
Binder of asphalt concrete (Ab) 6 650m2
Wear layer of asphalt concrete (Ab) 6 600m2
Concrete overhang 2 500m2
Straight curbs of quarried stone approx. 3 250m
Road lighting, 57 sites
Luminaire 'accent lighting' of trees 40 pcs
The project will be carried out on the basis of drawings
The tender conference will take place on 12.2.2014 at Hamar Vegkontor at 12:00 noon.