One singel contract covering:
Delivery and Installation of Complete Turbine Units(2) with Generators(2) and Control System
The scope of sulpply covers:
•Turbines, 2 equal sized hydroelectrical turbines
•Generators, 2 equal sized units
•Common control system for total package
•HV and LV work
The Contractor shall be responsible for the complete delivery:
•Management
•Design and Engineering
•Interface with other contractors
•Material supply
•Manufacturing
•Assembly work, work shop
•Delivery to installation site, Bykle, Norway
•Installation work
•Testing
•Trial run supervision
•Documentation
Turbines (2)
Type unit:Francis, vertical
No. off: 2
Head-and tail water levels:
•Highest regulated head water level: 633 (m.a.s.l)
•Lowest regulated head water level: 630 (m.a.s.l)
•Highest tail water level: 551 (m.a.s.l)
•Lowest tail water level:495 (m.a.s.l)
Water flow: 2 x 16,5 (m3/s)
Capacity:2 x 12 MW
An electronically governor and a high pressure hydraulic unit with an accumulator to be supplied.
Cooling water and drain system to be part of the supply.
Generators(2)
No. off:2
Capacity:2x 15 MVA
Requirements: According to IEC 60 034.
Control and Management system (1)
Management and control of the complete system.
The system to be designed and built for manual - as well as for fully automatically operation from a Common Control Centre 30 km away from the Skarg power station.
All electrical (HV & LV) work up to connection of the grid line to be in the scope.(Transformer(1) delivered by others)
Kontraktstildeling
Tittel: Skarg power plant; Turbines, generators, control system
Dato for kontraktstildeling: 23-02-2012
Antall mottatte tilbud: 3
Kontaktpunkt for leverandøren som har blitt tildelt kontrakten:
Rainpower Small Hydro AS, Instituttveien 8, 2007 Kjeller, NO.