Assignment text
The decommissioned pipeline and stations will be removed by another contractor. The scope of work comprises the following main activities.
1)Design and construction of approximately 26 km new 30” 80 bar Gas Transmission Pipeline.
2)Design and construction of 3 new Line Valve Stations.
3)Design and construction of cable duct and fibre optical cable along 26 km pipeline including inspection wells for each 5 km.
4)Design and construction of approximately 400 m new 30” 80 bar Gas Transmission Pipeline at Blommenslyst.
5)Tie-in of the new pipeline sections to the existing Gas Transmission System at 4 locations (TP1-2-3-4).
For further details concerning the scope of work the Contracting Authority refers to General Re-quirements (doc.21/08999-02) and Design report (doc. 21/08999-01). The languages of this tender are Danish and English. All tender documents are available in English, however the authentical version of the Design report is the Danish version.