This contract is for the establishment of a new roundabout in an existing junction, a new foot and cycle path with a bridge over county road 12 and new bus lay-bys on both sides of the road. The road and foot and cycle path are to be adapted to the existing road network.
The work that is to be carried out includes, amongst other things, road, filling, concrete, site electro, electro, asphalt, gardening, railing and kerbstone work. The total length for the project is approx. 370 m.