Tidsfristen er overskredet
The contract includes 9 mobile passenger boarding bridges (PBB) with docking guidance system (DGS), with communication interface to existing gate operation and management system.
Furthermore, the contract includes an option on 6 additional PBBs and 20 DGS.
The contract includes after sales service, incl. spare part supply for minimum 15 years.