Tidsfristen er overskredet
The Contract comprises the operation and maintenance of the complete system of the Copenhagen Metro, M1+M2.
The Copenhagen Metro, M1+M2, is a driverless metro system. It has two lines running from suburban Vanløse to Vestamager (M1) and Lufthavnen (M2). The lines share common tracks between Vanløse and a bifurcation after Christianshavn.
The sections from Nørreport to Vestamager and Nørreport to Lergravsparken opened in 2002. The section from Vanløse to Nørreport opened in 2003 and the final section from Lergravsparken to Lufthavnen opened in 2007. The lines cover 21 km. 10 km in tunnels and 11 km on elevated tracks and embankment. There are 22 stations of which 9 are situated underground.
The Copenhagen Metro runs 24 hours a day 7 days a week.
The number of passengers in 2015 was 57 mio. The number of passengers is expected to increase when Cityringen, a new underground circle metro line in Copenhagen opens.