E09 — Water and Sewage Brekka-Kvammen

Information

02 - Udbudsbekendtgørelse
Udbud med forhandling
29-01-2019 09:38 (GMT+01:00)
22-02-2019 12:00

Indkøber

Orkdal kommune, Tekniske tjenester Orkdal kommune, Tekniske tjenester
Bjørn Idar Ekren
Allfarveien 5, Postboks 83
7301 Orkanger
Norge
991 193 367

Tidsfristen er overskredet

Kort beskrivelse

Orkdal kommune shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E09 — applies to the fourth stage of the transfer system from Brekka to Kvammen. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts, E07-E08 will be announced consecutively. Contract E09 includes the controlled drilling in loose deposits and the delivery/pull-in of: — approx. 250 m Ø400 mm water main, — approx. 250 m Ø125 mm conduits for cables.

Mercell A/S

En del af Mercell, en af Europas ledende aktører inden for formidling af information mellem indkøber og leverandør på det professionelle marked. CVR nr. 25698851

Kontakt

Klik her for at gå til support

+45 63 13 37 00
Mercell A/S | B!NGS
Vesterbrogade 149
, 1620 København V, Danmark