Avinor AS Oslo Airport will re-asphalt the eastern runway in 2019.
In addition to the re-asphalting, approach 19L must be upgraded to CATII/III so that it can be used under low visibility conditions.
The electrical contract for this work will, at times, be an intense contract with disconnections and disassembly of runway lights, drilling out old pots, as well as the assembly of new pots and fixtures and connecting them. Auxiliary work for new LLZ aerials will be an option.