Assignment text
Based on the scope of work the consultant shall prepare a tender for the consultancy services required to construct the Lillebælt crossing within the specified corridor. The construction contract (Contractor), prepared separately by the Client, will be based on the document package prepared by the Consultant for the scope of work. The objective for this Consultancy Agreement is to prepare the following documentation for the Lillebælt crossing: — preparation of detailed design for the Lillebælt crossing, — preparation of technical documentation for obtaining design/construction permits for the onshore and offshore pipeline sections, — preparation of the technical specifications and MTOs for line pipe procurement.