Assignment text
Double train sets where implemented on the Kongsvinger Line from 2014. Considerable platform extension is therefore required for Sørum Station. A request for moving the system crossing from Roven to Sørumsand has been made in connection with preparing the schedule.
The following works shall be executed:
— renovation, extension and elevation of platform 1,
— demolition of mid-platform 2,
— establishment of a sub-passage through the station area with stairs and lifts in both ends,
— establishment of a new platform at track 3,
— a new overhead contact system for the station area shall be established from the approach area to the exit area,
— New track and reinforcement layer between the points in track 3.