Short description
A foot and cycle path shall be constructed along county road 44 from Sør-Varhaugveien to Grødaland. The entire foot and cycle path shall be located on the west side of the current county road. Bus-bays shall also be established for the stretch. Of which one bus-bay is located at the east side of the road. The zoning plan nº 1052 and 1136 for Hå municipality shall be the basis for the engineering design and construction works. The main objective of the project is to construct a traffic safe service for pedestrians and cyclists for the stretch between Grødaland bygdetun in the north and Brattland in the south. This stretch is currently a "missing link" for a continuous foot/cycle path service along County road 44, north of Varhaug.