Stange kommune, hereafter called the Contracting Authority, shall enter into a group contract with an engineering design team consisting of consultants in the disciplines of Architect, Civil Engineer, Fire Engineer, Electrical Engineer (RIE/RITB) and Ventilation Engineer for programming, preparation of the preliminary project and afterwards, also tender documentation for a builder developed turnkey contract for the first construction phase at Hoberg School in Ottestad, based on a prepared feasibility study that was approved by the municipal council in autumn 2017 (CASE 17/1559 Future School Structure in the Ottestad area).