Demolition of the burnt down buildings has already been carried out and is not a part of this project. Rehabilitation of the existing administration building after the fire and establishment of rigging shall be carried out by the builder before contracting of the turnkey contractor and is not included in this project. The rigging area will be established in accordance with Annex 1.13 Builder’s proposal for rigging plan.
The turnkey contract must include some completions and changes in connection with the transition between the new and existing building, as well as some adaptations and completion of technical installations and conduits. See annex 1.2 and 1.3 for further information.
The new construction shall be erected with a total of three floors with an available area of 1,495 m2 and a gross area of 1,660 m2.
The architect will be transferred to the turnkey contractor.