Solås school is a primary school (1-7), currently with 2 parallel classes, i.e. 14 classes in total. Due to the population growth, the capacity must be increased so to house 22 classes, and it is therefore necessary to erect a new building in connection with the existing premises.
A new standalone structure shall be built at the school site, approx. 2,000 m2 gross. School operation shall take place in the existing building during the construction period. The school is located in a development area where new access roads and many new residences are planned.
The contracting authority uses Mercell Sourcing Service. To express your interest and gain access to any documents, please click on the link below or copy and paste the link into your browser: https://permalink.mercell.com/78719345.aspx
Then follow the instructions on the web page.