The contract includes engineering design and the delivery of a complete turnkey school for 300 pupils, including a standard multi-user hall with an activity area of 23 x 44 m as an integrated part of the school building. An artificial grass field (11-a-side pitch) with lighting. The outside area shall be developed as a part of the project, including roads, car parks and other infrastructure such as water, sewage, electricity and fibre. The contract will be executed as a turnkey contract, NS8407 with a solution proposal.