The contracting authority would like tenders for a computer programme for drill parameter interpretation, processing, collocation and presentation of drill data that is continually obtained from the tunnel rig (MWD data; Measuring While Drilling) from tunnelling at Rogfast. The tunnel will have several attack points with up to 12 rigs in operation simultaneously.