The expansion of Urnesbukta marina shall utilise the area's current infrastructure as far as possible. The laying of power lines, water pipes, road works, abutments, etc. are therefore not included in the tender. The contract includes the procurement of dock and marina supplies, engineering design and execution of the expansion work.
The delivery shall be ready and assembled, including necessary anchoring with chains/ropes, shackles, moorings and other required supplies for a well-functioning floating dock facility.