The Contracting Authority wants to purchase an in-line inspection of three (3) pipelines during 2017, two (2) pipelines during 2018 and four (4) pipelines during 2019. Furthermore the tender includes an option of an intelligent survey with a multiple intelligent pig tool for one (1) pipeline. The option is to be seen as optional and will not be a part of the evaluation.