Framework agreement for the period 2016 — 2021 — engineering design management, construction management, architect, construction engineering, construction financesand municipal engineering consultancy services.

Information

Open procedure
3/17/2016 9:26 AM (GMT+01:00)
5/20/2016 2:00 PM

Buyer

Frogn kommune [Frogn municipality] Frogn kommune [Frogn municipality]
Bjørn Nordvik
P.B. 10
1441 Drøbak
Norway
963999089

Closing date has passed.

Short description

Frogn municipality, (later called the municipality), shall enter into framework agreements for the development of area plans and the execution of development projects within property and municipal engineering. It is a prerequisite that services can be provided within the following disciplines:

1. Engineering design management

2. Architect services (area planning)

3. Architect services (engineering design)

4. Interior architect services

5. Landscape architect services

6. Arborist/biology services

7. Surveying and map production

8. Geotechniques

9. Construction engineering steel/concrete

10. Construction engineering wood

11. Construction physics

12. Electro engineering

13. HVAC engineering

14. Sprinkler installations (engineering design)

15. Building automation

16. Acoustics

17. FIre engineering

18. Environment mapping and pollution

19. Environment certification (Breeam AP and auditor)

20. LCC- analysis

21. Water supply

22. Sewage engineering

23. Road and street light installations

24. Traffic planning

25. River systems engineering (hydrolog)

26. Quays and ports

27. Bridges

28. Water and sewage automation

29. Construction management

30. Construction finances (cost calculations)

Frogn municipality would like to enter into a framework agreement with three tenderers within each of the seven main categories:

— Engineering design management (point 1 above).

— Architect services (points 2-7 above).

— Construction services (points 8-18 above).

— Environment certification and LCC (Points 19-20 above).

— Municipal engineering services (points 21-28 above).

— Construction management (point 29 above).

— Construction finances (point 30 above).

The call-offs within each main category will be distributed almost equally between the three who are awarded a contract in the period.

Tenders can be submitted for one or several of the main categories, but tenders cannot be submitted within a single discipline for the main categories architect, construction environment certification, LCC and municipal engineering services.

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00