The project comprises construction of a new four lane road from the junction at Austreimsvegen in the south and for connecting to the existing road north of the junction with Jovegen, profile 408-1745. The following shall be built: 2 new road bridges, a new environment tunnel, an underpass, 2 foot bridges, two roundabouts, foot and cycle paths, bus stops and side roads. In addition, noise dampers and noise barriers will be erected along the road. The combined length of driving roads, including bridges and environmental tunnel is approx. 1,700 m.