The contracting authority plans to build a new school building for approx. 450 students. Gross area: approx. 4 800 m2. The swimming pool will be subject to small renovations. The building from 2003 shall to some degree be altered in relation to the room plan.
A new sports centre/multi-purpose building with an area of approx. 1 700 m2 shall be constructed. This building shall be connected to the existing swimming pool.