The Nordland Hospital Vesterålen is a new hospital with an area of approx. 15 000 m². It is now in use and the existing unused buildings are subject demolition.
As a part of this, a number of preparatory works, both HVAC technical, electro technical and constructional, shall be executed. The works comprise roughly of re-adjustment and alteration of technical plants and accompanying constructional works for the following buildings:
Wing M — Laundry building.
Wing R — Kitchen.
Wing K — Administration.
Wing V — Psychiatry.
The preparatory works ('Preparation to demolition') are divided in the following contracts:
K 223 Preparation to demolition — construction works for buildings.
K 307 Preparation to demolition — HVAC technical works.
K 401 Preparation to demolition — electro technical works.
The tender documents are scheduled ready 2.9.2014. Access to the project hotel is available by written registration to utbygg@nlsh.no