The existing one lane summer road shall be altered to a standard 2-lane road on the stretch county road 98 Suolojávri – Giilaš. The stretch is a total of 4.9 km and starts at the end of the ongoing lot 5a (the municipality border Gamvik/Tana) and ends 350 metres after the large car park down at Giilaš.