T3 Avinor Flesland 80402 Concrete Constructions — Concrete bridge.

Information

Negotiated procedure
1/8/2015 4:31 AM (GMT+01:00)

Buyer

Avinor AS985198292 Avinor AS985198292
Sweco Norge AS Bergen Sweco Norge AS Bergen
Silja Kristiansen Bruland
Postboks 150
2061 Gardermoen
Norway

Assignment text

Overall and preliminary scope of benefits in the contract 80402:

In connection with construction of the new terminal at Flesland, a concrete bridge will be built for upper traffic plaza at the terminals east wall. The bridge will act as the access zone to the terminal and will be connected to the terminal by footbridges.

The upper traffic plaza will be undertaken as a 230 m long driving bridge with off and on ramps at each end.

The bridge is designed with column pairs with 18 m distance in the longitudinal direction and 15 m in the transverse direction.

The superstructure will have a cross section height of 1 100 mm in the middle of the bridge. The cross section height will reduce gradually after the column so that the side span appears slimmer.

The bridge will be performed in cast-in-place concrete and foundations laid directly on the mountain. Excess foundation will lie 0.5 m under the projected terrain in the area. The columns will have a diameter of approximately 1 100 mm.

The abutments can be founded directly on the rock, alternatively on filling. Power supply to the Upper traffic plaza will be placed in one of the abutments.

Ground clearance under the bridge will be approximately 7 m. The width of the bridge starts at approximately 5 m and gradually increases to 25 m to once again decrease to approximately 5 m.

The cross section is divided into driving lanes/exit lanes and walking areas/furnishing zones. There will be a stone coating on the walking and furnishing zones, separated by curb against the wearing course on the road.

Guard rails to the outside of the traffic plaza shall comply with applicable regulations and be in accordance with the overall architecture of the project.

Draining of the traffic plaza shall be integrated with partially hidden drain pipes in the columns. Continuation of the water/waste water installations on the lower traffic plaza coordinated water/waste water on the lower traffic plaza.

Cable conduits and manholes for electrical and telecommunications installations shall be integrated in the construction.

The bridge will function as a set up for 3 walking bridges in steel from the terminal building.

Because of the placement and integration with other building in the area, emphasis must be placed on the interface and coordination.

The bridge is designed and dimensioned according to the Statens Vegvesen Håndbok 185 (Norwegian Public Roads Administration Handbook 185), dated 2011, and Eurocodes NS-EN 1990-1992.

Section V: Award of contract

V.1.1) Date of contract award decision:

14.11.2014

V.1.2) Information about offers

Number of offers received: 4

V.1.3) Name and address of economic operator in favour of whom the contract award decision has been taken

Peab Anlegg AS913502566, Postboks 93 Røa, 0701 Oslo, NORWAY

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00