I/S Vestforbrænding has decided to improve the availability and flexibility of the district heating system. In this connection, a pressurized heat storage tank (HST) must be installed.
This Contract comprises design, manufacture, inspection and testing, etc., of:
•A pressurized heat storage tank (approx. 1,625 m3) installed on existing concrete foundation, incl. necessary parts for embedding/fastening the heat storage tank to the concrete foundation. Concrete foundation is an Employer scope of supply.
•Insulation of the HST.
•Stair tower with platform on the top of the HST for access to inspection openings and operation/maintenance of the HST's valves, sensors and other equipment and components installed on the HST, etc.
•CE marking in accordance with applicable directives and regulations as well as installation control.