MARKET DIALOGUE: Structural designing of the new generation 60E1-turnouts in Finland

Information

01 - Prior information notice
Not applicable
2/27/2023 3:25 PM (GMT+01:00)

Buyer

Väylävirasto Väylävirasto
Tuija Myllymäki Tuija Myllymäki
PL 33 (Opastinsilta 12 A)
00521 HELSINKI
Finland
1010547-1

Short description

MARKET DIALOGUE

The aim for this market dialogue is the public procurement, which enables the design of the new generation 60E1-turnout structure for the Finnish Transport Infrastructure Agency (FTIA).

BACKGROUND AND DESCRIPTION OF THE PRESENT SITUATION

Most of the turnouts in Finnish rail network are really stiff structures, which are designed in the ´90s. These structures cannot anymore completely satisfy the current needs, which are forcing the turnouts to bear more loads and enable higher speeds. This has raised new structural needs for single 60E1-turnouts, which can be used in conventional track and also in high-speed track.

OBJECTIVES

Objectives of this procurement is to receive the designs and drawings of new generation 60E1-300E-1:9 and 60E1-900E-1:18M turnouts (marked with X in the list below) so that in future those can be used as a reference structure for the other 60E1-turnout types. Geometrical design (curve radius and crossing ratio) should remain the same as in current turnouts, so only new structural design is needed. The complete package of new generation 60E1-turnouts includes following single turnouts:

• 60E1-300E-1:9 (X)

• 60E1-500E-1:11,1

• 60E1-500E-1:14

• 60E1-900E-1:15,5

• 60E1-900E-1:18

• 60E1-900E-1:18M (with movable crossing) (X)

All the detailed technical specification of these new generation turnouts will be specified with the chosen designer after the procurement.

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00