The assignment consists of project certification across wind turbine generators and gravity-based foundations on the Aflandshage off-shore wind-project in the Øresund area.
The project certification scope will be conducted according to IEC RE OD-502:2018 and will include following modules to be carried out by the project certification body on behalf of the Contracting Authority:
Site Assessment Conditions,
Design Basis Evaluation,
Final Evaluation and
Project Certificate
Other mandatory modules will be supplied by certification bodies accredited to the same rules as outlined below but on behalf of other entities engaged in the project (external modules). The certification output (Statements of Compliance and Certification Reports) of following modules shall be reviewed and included into the project certificate by the Project Certifying Body:
Type Certificate
Integrated Load Analysis
Wind Turbine / RNA Design Evaluation
Support Structure Design Evaluation incl. Foundation Loads
Wind Turbine / RNA Manufacturing Surveillance
Support Structure Manufacturing Surveillance
Transport and Installation Surveillance
Commissioning Surveillance
In addition to the above, the Project Certification Body is requested to accompany the certification of the external modules to safeguard a successful certification process.
The tenderer must be listed with the Danish Energy Agency and EN 17065 and accreditation is mandatory prior to applying for participation in this tender process. Link to the Danish Energy Agency: https://cas.ens.dk/certification/list-certifying-bodies/
The indicative time schedule is as follows:
Invitation to submit tender: 14.10.2022
Deadline for submission of tenders: 10.11.2022 at 1 pm
Award of contract: 08.12.2022
Commencement of contract: 20.12.2022
Delivery of Preliminary Site Assessment Conditions: 01.03.2023.
Accredited suppliers who are interested in participating in the tender must confirm their interest to the contact person listed below no later than the 10th October 2022.