Assignment text
This assignment is a sub-project in the E18 West Corridor. The purpose of the assignment is to establish a system to counter any pore pressure changes during the construction period. The main part of the assignment consists of drilling, installing and operating water filtration wells etc. and monitoring. A website system must be delivered for presentation of remote monitoring and remote control. The assignment is for the contracts, E102, E103 and E105.