Assignment text
The contract includes preparatory work for the introduction of ERTMS on the section (Asker) – Drammen on the Drammen line, (Drammen) - (Vestfossen) on the Sørland line and (Drammen) - (Sem) on the Vestfold line. The scope includes the design and construction of guideways. Guideways are in this contract defined as cable ducts, pipe trenches, pipe crossings under tracks and traction / cable manholes. Simultaneously, a new power supply shall also be designed and built at all locations, as well as an area prepared for technical buildings.