Short description
The project concerns measures for dredging in Senjahopen harbour. The dredged matter is seen as polluted. The bottom mainly consists of 2 layers. The upper layer is a loose to medium solid layer, under which is a solid layer less than 2 m. However, there will also be dredging in hard moraine.
The dredged matter is seen as polluted, and all the matter from the harbour basin must be transported to land and taken to the Hanslaraneset landfill site, filling 1. The reception and laying of polluted matter within the included breakwater at Hanslarsaneset is an option.
After the polluted dredged matter from the harbour has been deposited, clean dredged matter from the entrance fairway is to laid on top. The reception and laying of clean dredged matter from the entrance fairway to Hanslarsaneset fillin 1 and Steinneset fillin 2 are options.