Short description
The primary purpose of this document is to verify the areas and volumes necessary for the incorporation of a new operational model that can increase efficiency and reduce cost within operations and maintenance CNS, MET- and ATM-systems and possibly also Electrical and IT equipment/systems.
The result of this RFI is requested to be presented in the form of a specification, briefly describing the supplier’s proposed model for operations; systems and related functions.
The primary purpose of this document is to verify the areas and volumes necessary for the incorporation of a new operational model that can increase efficiency and reduce cost within operations and maintenance CNS, MET- and ATM-systems and possibly also Electrical and IT equipment/systems.
The result of this RFI is requested to be presented in the form of a specification, briefly describing the supplier’s proposed model for operations; systems and related functions.