Assignment text
A wider seaward approach to Bodø and a deeper sailing depth are planned. This includes the deepening of 3 banks in the seaward approach to Bodø harbour as well as the dredging of a larger field inside Bodø harbour.
The polluted seabed sediments and parts of the clean dredged material must be disposed at a waterside disposal built by cell piles with side fillings. The surplus of clean dredged materials shall be dropped in the sea disposal site.