Assignment text
The objective for the FEED for Compressor Station Everdrup is to mature and further develop the results from the concept study cf. Concept Study (ID 4.3), including all subsequent changes and modifications annotated in the concept study documents and/or listed in Appendix 1 (ID 4.0), in further details in co-operation with the Contracting Authority and prepare the necessary documentation in order for the Contracting Authority to enter with nominated contractors in to two (2) contracts for the detailed design and construction works (Engineering, Procurement and Construction (EPC) contracts):
— EPC contract for land development and administration facilities,
— EPC contract for plant facilities,
— for further details concerning the tendered scope, reference is made to the appendices to the tender documents.