The settlement and infrastructure along the Vossavassdraget are exposed to floods. Based on a hydrological and hydraulic model of the watercourse, the objective of the contract is to review further use of flood tunnels and local flood control measures for finding robust safety technical measures. The contract includes option for following the project up.