Voluntary Announcement: Feasibility Study — BHS at New Airport in Bodø

Hankinnan yleistiedot

05 - Hankintailmoitus – erityisalat (5)
Avoin menettely
30.10.2019 10.36 (GMT+02:00)
2.12.2019 16.00

Hankintayksikkö

Avinor AS Avinor AS
Remi Ludvigsen
Postboks 150
2061 Gardermoen
Norja
985198292

Määräaika on umpeutunut

Lyhyt kuvaus

Voluntary announcement (below the EU/EEA threshold value under the utilities regulations (No: ‘forsyningsforskriften)) The new airport in Bodø will replace the existing airport in Bodø by 2025-2027. As part of the planning of a new airport in Bodø, Avinor wants to carry out a feasibility study to evalueate and verify, among other things area and volumes needed for the construction of a new state-of-the-art fully automated baggage handling system (BHS). The findings of this feasibility study shall be presented as aa specification, which briefly describes the BHS system and the proposed features and functions. The specification shall include a brief description of technology and functionality, any references, a sketch for a solution in CAD model or similar 3D illustrations. In addition, the delivery shall include a preliminary plan for implementation with total costs and LCC (life cycle costs).C (livssykluskostnader).

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600