Voluntary Announcement: Feasibility Study — BHS at New Airport in Bodø

Hange

05 - Contract notice - utilities
Avatud menetlus
30.10.2019 10:36 (GMT+02:00)
02.12.2019 16:00

Hankija

Avinor AS Avinor AS
Remi Ludvigsen
Postboks 150
2061 Gardermoen
Norra
985198292

Hange on lõppenud

Hanke lühikirjeldus

Voluntary announcement (below the EU/EEA threshold value under the utilities regulations (No: ‘forsyningsforskriften)) The new airport in Bodø will replace the existing airport in Bodø by 2025-2027. As part of the planning of a new airport in Bodø, Avinor wants to carry out a feasibility study to evalueate and verify, among other things area and volumes needed for the construction of a new state-of-the-art fully automated baggage handling system (BHS). The findings of this feasibility study shall be presented as aa specification, which briefly describes the BHS system and the proposed features and functions. The specification shall include a brief description of technology and functionality, any references, a sketch for a solution in CAD model or similar 3D illustrations. In addition, the delivery shall include a preliminary plan for implementation with total costs and LCC (life cycle costs).C (livssykluskostnader).

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti